CAII emblem
CAII
Caribbean AI Institute
Project showcase

Island offshore wind–storage–compute digital twin

Model offshore wind, batteries and flexible AI workloads together to assess island grid resilience, energy costs and hurricane operating limits.

Engineering concept illustration; not a photograph of a CAII deployment.

Progress stage · Proposed concept · progress unverified

These concepts are proposed by the website for discussion. No project start, funding, pilot or institutional participation has been confirmed; the institutions below are prospective candidates, not project partners.

Research goals

  1. 01

    Assess island grid resilience with offshore wind, storage and flexible compute loads.

  2. 02

    Compare energy costs and hurricane operating limits against a baseline.

Technical pathway

  1. 01

    Specify candidate-site wind, grid, storage and compute-demand data with uncertainty.

  2. 02

    Build a coupled wind–battery–compute digital twin and compare dispatch strategies.

  3. 03

    Simulate storms, forecast errors and constrained operation before considering a permitted pilot.

Expected outputs

Proposed deliverables · not completed results

  1. 01

    A documented digital twin and scenario dataset.

  2. 02

    A resilience and cost comparison with safe-operation limits and a validation plan.

Progress evidence

CAII progress not verified

Available basis

The site currently documents a project concept, a proposed next milestone and external technical references only. No CAII start approval, funding record, test report or deployment evidence has been supplied. Actual progress remains unverified.

Proposed next milestone

Define candidate-site data needs and establish a simulation baseline with grid operators.

Evidence needed to verify progress

  • Dated project approval, scope and accountable team records.
  • Traceable input data, model versions and signed test or assessment reports.
  • Where applicable: permits, environmental review, deployment acceptance and written institutional agreements.

These are proposed verification requirements, not documents already received or milestones already achieved.

Verifiable technical references

References support the proposed technical pathway, not CAII project progress, partnership or certification. Publisher documents retain their original language; standards may require purchase and are not proof of compliance.

  1. IEA

    Offshore Wind Outlook 2019

    Technology and geospatial resource context for offshore wind feasibility; published in 2019, not a current local site assessment.

    https://www.iea.org/reports/offshore-wind-outlook-2019

    Open original source

    Link checked: 31 October 2026

  2. IEA

    Offshore Wind Geospatial Analysis

    Resource assessment methodology using depth, distance from shore and competing-use exclusions; not a Caribbean site survey.

    https://www.iea.org/data-and-statistics/data-tools/offshore-wind-geospatial-analysis

    Open original source

    Link checked: 31 October 2026