CAII emblem
CAII
Caribbean AI Institute
Project showcase

Subsea capsule deployment and robotic inspection

Study vessel positioning, lifting and ROV inspection for safe capsule deployment, recovery and maintenance.

Engineering concept illustration; not a photograph of a CAII deployment.

Progress stage · Proposed concept · progress unverified

These concepts are proposed by the website for discussion. No project start, funding, pilot or institutional participation has been confirmed; the institutions below are prospective candidates, not project partners.

Research goals

  1. 01

    Design safe capsule deployment and retrieval workflows.

  2. 02

    Study vessel, lifting-system and ROV coordination for inspection.

Technical pathway

  1. 01

    Specify vessel and robot interfaces, positioning, lifting loads and weather windows.

  2. 02

    Simulate capsule handling and ROV inspection with operator-supervised mission planning.

  3. 03

    Rehearse loss-of-power and emergency recovery scenarios and define stop-work limits.

Expected outputs

Proposed deliverables · not completed results

  1. 01

    A vessel–capsule–robot interface specification and operating workflow.

  2. 02

    An inspection mission concept, simulation records to be produced and emergency-recovery test plan.

Progress evidence

CAII progress not verified

Available basis

The site currently documents a project concept, a proposed next milestone and external technical references only. No CAII start approval, funding record, test report or deployment evidence has been supplied. Actual progress remains unverified.

Proposed next milestone

Specify vessel and robot interfaces and rehearse deployment and emergency-recovery scenarios in simulation.

Evidence needed to verify progress

  • Dated project approval, scope and accountable team records.
  • Traceable input data, model versions and signed test or assessment reports.
  • Where applicable: permits, environmental review, deployment acceptance and written institutional agreements.

These are proposed verification requirements, not documents already received or milestones already achieved.

Verifiable technical references

References support the proposed technical pathway, not CAII project progress, partnership or certification. Publisher documents retain their original language; standards may require purchase and are not proof of compliance.

  1. IMCA

    Guidelines for the design and operation of dynamically positioned vessels

    DP vessel design and operation guidance, including ROV-support and crane-vessel contexts; full access may be restricted.

    https://www.imca-int.com/resources/technical-library/document/8ed42e5e-c55b-ee11-8def-6045bdf1ea43/

    Open original source

    Link checked: 31 October 2026

  2. IMCA

    Diving operations from vessels operating in dynamically positioned mode

    Planning, responsibilities and safety limits for diving from DP vessels; relevant only where diving is included, not a capsule engineering specification.

    https://www.imca-int.com/resources/technical-library/document/2f07f45c-c55b-ee11-8def-6045bdd2c7e3/

    Open original source

    Link checked: 31 October 2026